01

Side-by-side

Decision pointDedicated PlatformManaged Orchestration
Existing coreReplaces or becomes the coreRemains in place
DeploymentClient environmentPulsePay-operated infrastructure
Data perimeterClient-controlledProcessed in the managed service
Provider coverageScoped to the deploymentSupported connector set, then extensions
Best forLaunch, migration or full controlFaster orchestration around a live stack
02

Choose Dedicated Platform when

  • You are launching or replacing the payment core
  • The platform must run inside your own infrastructure boundary
  • The project requires deeper payment, payout or ledger logic
  • Provider coverage must be scoped around your own contracts
03

Choose Managed Orchestration when

  • The current core still performs its job
  • Provider resilience and routing are the immediate constraint
  • You want to avoid a platform migration before improving operations
  • The managed connector and data model fit the intended scope
04

The choice can evolve

Orchestration can be the first step while a team proves new routes or keeps a legacy core running. A dedicated deployment becomes relevant later if infrastructure ownership, data location or platform depth changes.

FAQ

Frequently asked questions

Which option goes live faster?
Managed Orchestration usually has a narrower initial scope, but the actual timeline for either model depends on provider access, integration readiness and required custom logic.
Do both models keep provider contracts with the client?
Yes. PulsePay provides technology; provider commercial relationships remain with the client.